How Installation Works

Every automatic car wash is a site project. This is the sequence we follow from first conversation to a running wash.

Engineers installing and commissioning a car wash gantry

Project stages

  1. EnquiryYou share your site or business requirement.
  2. Site assessmentWe review space, access, queueing, water, drainage and power.
  3. Technical configurationWe recommend the wash format and stages that fit the site.
  4. Commercial proposalA written proposal covering scope, equipment and terms.
  5. ApprovalsThe site owner obtains applicable permissions; we share technical documents needed for applications.
  6. InstallationCivil readiness is checked, then equipment is installed and connected.
  7. Testing & commissioningSystems are tested with trial washes before handover.
  8. TrainingOperators are trained on daily operation, safety and basic upkeep.
  9. SupportOngoing maintenance, spares and service support.

Approvals, timelines and commissioning depend on the project, the state and the site. We do not commit to a timeline before the site assessment.