Planning

Site Requirements

Use this checklist to prepare for a site assessment. Exact figures depend on the configuration and are confirmed by our team.

Site plan showing wash tunnel, queue, tanks and exit

Physical site

  • Plot length and width suitable for the selected format (tunnels need a long straight run)
  • Clear entry and exit with space for vehicles to queue without blocking roads or fuel lanes
  • Level, load-bearing floor or space to build one
  • Space for water treatment tanks and equipment room
  • Covered or canopy area if required by design

Utilities

  • Reliable water source and storage (municipal, borewell or tanker)
  • Drainage to the treatment system — no direct discharge to storm drains
  • Three-phase electrical supply with adequate sanctioned load
  • Power backup where supply is unreliable

Permissions — confirm for your state and site

  • Land-use / zoning permission for commercial activity
  • Consent to Establish and Consent to Operate from the State Pollution Control Board (CPCB places automobile service stations in the Orange category)
  • Compliance with notified effluent standards for automobile service stations
  • Groundwater / borewell permission where applicable
  • Municipal trade licence and Shops & Establishment registration
  • Fire NOC where applicable
  • Electrical installation inspection where applicable
  • Oil-company approval for installations inside fuel retail outlets
  • GST registration

This is general guidance, not legal advice. Requirements differ by state and local authority.

Have a site? Register it for assessment

Fields marked optional can be left blank. You will receive a reference ID after submitting.

10-digit Indian mobile, or international number with country code